Gas Storage Project - Brine Pond Construction
|
|
URS Energy & Construction, Inc.
Franklin Parish, Louisiana
Beard was awarded the contract to construct a 30 acre site consisting of three brine pond storage facility to support an underground gas storage cavern. The brine ponds included primary east pond, a primary west pond and a secondary pond all lined with a conductive HDPE liner for leak detection. The facility will be adding a compressor station and for the storage and transport of natural gas.
 |
|
 |
|
|
|
Scope of Work
-
Erosion and sedimentation control—silt fence, berms and grading and hay placement
-
Clearing, grubbing the 30 acre site
-
Removal of 31,468 CY of topsoil
-
Installation of 964 LF of 12” RCP an 18” carbon steel pipe with HDPE casings
-
3,090 lf of French under-drain system
-
Installation of 457,536 SF of conductive HDPE liner & leak detection system.
-
Installation of shoring & dewatering systems
-
Installation of sumps, pipe, culverts & manholes
-
Ditches, roads, parking with sub-base compaction, filter fabric and stone surfacing
-
168,418 CY of mass earthwork for the cut & fill of the three brine ponds
-
Seeding, hydro-mulching, re-vegetation of 12.7 acres
Beard Contract Value: $ 2.5 Million
Project Start Date: June 2010
Completion Date: September 2010 |
|
 |
| |
|
|
|
|