Flare Gas Control Project
|
|
ExxonMobil/KBR
Beaumont, Texas
BCG was awarded the $12.25 million civil contract for the Flare Gas Control Project, which included construction of concrete compressor foundations, pipe rack foundations, flow metering platforms and miscellaneous supports at ExxonMobil's Beaumont Refinery.
Scope of Work
-
7,500 cy concrete foundations
-
775 cy concrete paving
-
244 tons reinforced steel
-
335 18” diameter x 45' long augered cast-in-place piles
-
150 24” diameter x 60” long augered cast-in-place piles
-
7,156 cy excavation
-
5,342 cy backfill
-
Storm-water drainage system
-
Oily-water drainage system
Beard Contract Value: $ 12.25 Million
Project Start Date: June 2008
Completion Date: August 2009
| |
|
|
|
|